Project Director, Senior Geologist, Senior Reservoir Engineer, Geologist, Engineer Fast Growing Group of Companies
Project Director
Report to the Board of Director and lead an organization to develop Independent Power Producer (IPP) scheme for Mine Mouth Power Plants, Biomass Power Plants and Geothermal Power Plants with capacity range from 6 to 100 MW.
Requirements :
- Minimum education Bachelor degree in Electrical (Power) or Mechanical or Physics Engineering
- Experienced as a Project Leader (at a level as Project Director or equivalent position) in at least one project of similar complexity, type and size
- The incumbent shall have experience in preparing feasibility study and basic design, budgeting, contract negotiation, funding and project implementation
- He / she should be familiar with legal requirements and prerequisites and environment issues
- Strong communication and leadership skill are required
Report to the Project Director, Leading a team of engineers of Geologists to conduct studies to ensures geothermal steam resources. The study includes geothermal reconnaisance and exploration investigations, reservoir engineering and resources assessment, environment management and steam field engineering, to support Geothermal Power Plants establishment. The study must be in certain quality accepted by international banks / lending institution.
Requirements :
- Education Bachelor degree in Oil or Mining Engineering or in Geology
- Experience minimum 10 years in similar works
- Willingness to work in remote area and interest in community development will be preferred
Geologist - General
Report to Senior Geologist / Senior Reservoir Engineer. Conduct studies to ensures geothermal steam resources. The study includes geothermal reconnaisance and exploration investigations, reservoir engineering and resources assessment, environment management and steam field engineering, to support Geothermal Power Plants establishment.
Requirements :
- Bachelor degree in Oil / Mining Engineering /Geology with 5 years of experience in drilling and geothermal wells.
- Willingness to work in remote area will be preferred
Engineer
Report to the Project Director. Develop technical aspects of Independent Power Producer (IPP) scheme for Mine Mouth Power Plants, Biomass Power Plants and Geothermal Power Plants with capacity range from 6 to 100 MW.
Requirements :
Bachelor degree in Mechanical / Civil /Industrial / Physics Engineering, with approximately 5 years of experience in the field of Geothermal Power Plant or Thermal Power Plant.
Please submit your application letter, CV and recent photograph not later than August 24, 2008 to : corp_hrm@yahoo.co.id